Road Projects Investigations
PROJECT | SCOPE OF WORK | CLIENT | PERIOD |
Consultancy Services for the Establishment of
Bus Rapid Transit Line 5 Project |
21 No. Boreholes Drilling
Laboratory Testing Geotechnical Report Trial pitting and Insitu Tests Full range of road tests Material Report Pavement Design Report |
CAS Consulting Engineers | Ongoing |
Consultancy Services for the Design and Construction Supervision of the Socio-Economic Infrastructure to the Local Communities in Turkana and West Pokot Counties | Trial pitting and Insitu Tests
Full range of facilities tests Material Report |
EGIS Kenya Ltd | Ongoing |
Meru Town Roads | Full range of road tests
Material Report Pavement Design Report |
ITEC Engineering | 2021 |
Tilisi Developement | Bitumen Mix Design | Kashyap Enterpises | 2021 |
Limited | |||
Marua-Nanyuki-Lewa Road A2 | Full range of road tests
Material Report |
GIBB International | 2020 |
Detailed Design | |||
Marua-Nanyuki-Lewa Road A2 | Full range of road tests
Material Report |
GIBB International | 2019 |
Preliminary Design | |||
Muthaiga-Kiambu-Ndumberi | Full range of road tests
Material Report |
Span Engineering | 2019 |
Road | Consultants | ||
Ngong Road Phase 2 Dualling | Full range of road tests
Material Report |
Katahira | 2019 |
Engineers & | |||
International | |||
Upgrading of Kibwezi Mutomo- | Full range of road tests
Material Report |
Sinohydro | 2019 |
Kitui (A9/B64) Road Project | Corporation Ltd | ||
Kisingo-Miangeni Ngomano | Full range of road tests
Material Report |
Miangeni Hardware | 2019 |
Kiangini Road | &Contractors | ||
Kapsabet and Kitale Town | Full range of road tests
Materials Report |
ITEC Consultants | 2018 |
Roads | |||
Kiambu County Roads | Full range of road tests
Materials Report |
County Government | 2016- |
of Kiambu | ongoing | ||
Garissa-Isiolo Road | Full range of road tests
Materials Report |
KIRI Consult & | 2015/2016 |
SMEC International | |||
Pty Limited |
Nairobi Metropolitan Roads | Full range of road tests
Materials Report |
Ministry of Nairobi
Metropolitan Development |
2014-2017 |
Mombasa Southern Bypass
Road |
Full range of road tests
Geophysical tests Materials Report |
Katahira Engineers &
International |
2014/2015 |
Annuity Roads (Luanda, Elkwanda, Mago, Mululu, Mbale etc | Full range of road tests
Materials Report |
ITEC Consultants | 2015 |
Maseno‐ Kombewa‐
Kalandini (D245/E1259) Roads |
Full range of road tests
Materials Report |
ITEC Consultants | 2014 |
Mombasa Southern Bypass | Full range of road tests | Katahira Engineers &
International |
2013 |
Kajiado – Isarage Rd | Full range of road tests
Materials Report |
APEC Consultants | 2013 |
Eldoret Bypass Road | Full range of road tests
Materials Report |
APEC Consultants | 2013 |
Outer Ring Road | Full range of road tests
Materials Report |
APEC Consultants | 2012 |
Ngong Road | Full range of road tests
Materials Report |
APEC Consultants | 2012 |
Tiomin Mining Roads | Full range of road tests
Materials Report |
MAXCAD
Consultants |
2011 |
Ol Joro Orok ‐ Dundori | Full range of road tests
Materials Report |
ITEC Consultants | 2010 |
KWS Tourist Roads | Full range of road tests
Materials Report |
M.C. Triton Bulgaria
Ltd |
2010 |
Thika Road | Full range of road tests
Materials Report |
APEC Consultants | 2009 |
Miiri‐Itundu Road
(D452/E604/E603/E599/E60 0) |
Full range of road tests
Materials Report |
APEC Consultants | 2008 |
Webuye – Malaba Road | Full range of road tests
Materials Report |
RUNJI &
PARTNERS |
2005 |
Giaki‐Marimanti – Chiakariga
(E789/E801/R24/28) Roads |
Full range of road tests | UNICONSULT | 2005 |
Kisii/Kakamega KUTIP
Projects |
Full range of road tests | GATH Consulting
Engineers |
2005 |
Kisumu KUTIP Projects | Full range of road tests | UNICONSULT | 2005 |
Machakos KUTIP Projects | Full range of road tests | UNICONSULT | 2005 |
Maimahiu‐Naivasha‐ | Material testing, Proving
Quarry materials |
Bamburi Cement Ltd | 2004 | |
Lanet Road | ||||
AFD Roads 2000 Project Full | Full range of road tests | Charchi | Githinji/ | 2004 |
range of road tests | Prome JV | |||
in Nyandarua, Murang’a | ||||
and Maragwa | ||||
El – Nino Projects | Full range of road tests | BCEOM/ | Cape | 2004 |
Consult | ||||
Kisumu – Kakamega – | Full range of road tests | Otieno Odongo | 2004 | |
Webuye – Kitale Rds | Partners | |||
Sagana ‐ Makutano | Full range of road tests | H/Z Dillingham | 2004 | |
Mathare 4A | Full range of road tests | Keyplan Engineers | 2004 |